1.Shearing: all kinds of iron products need to be sheared after recycling, and then the size of the molding is carried out through a variety of tools and equipment, so as to make the metal structure to better use standards.

 

2.Compression: that is to say, packing is mainly for some loose pipes or some broken containers. The purpose of doing this is to reduce the volume and reduce the pressure in the process of loading, unloading and transportation.

 

3.Grinding: for some large pieces of scrap iron or associated with some bad subsidiary particles, we must thoroughly crush and grind them.

Leave a Reply

Your email address will not be published. Required fields are marked *

Chinese Deutsch Espanol Francais Italiano Portugues Japanese Korean Arabic Russian