How Vertical mill operate?
1. Start up Vertical mill 1) Turn on main switch 2) Start air compressor, adjust air pressure of oil-water filter to 0.6-0.7 Pa. 3) Turn on bag filter pulse controller, adjust the pulse frequency to one spray every 4-5 seconds, adjust pulse width to 0.5-0.8 seconds (pulse controller was set before delivery) 4) Switch on […]